Batteries
The Battery Passport: 71 data points and rules on differentiated access
DG GROW maps out battery passport data points, with tiered access for the public vs. certified recyclers.
Read more → StandardsCEN-CENELEC standards EN 18219 and EN 18220
Adopted standards confirm decentralized architecture: product data will not be stored in Brussels.
Read more → TimelineSix months to the battery passport
18 February 2027 is the first hard DPP date. Six months is enough if the data foundation is started now.
Read more → ProductWe are integrating with the EU DPP registry
Passports you structure in OC should be able to be registered in the Commission’s registry – identifiers and metadata, not the full product data.
Read more →Previous articles
Articles on digital product passports, traceability and reporting. For current guidance, see the guides.
Want to go from news to action?
Look through the guides, or book 30 minutes around your product group.
To the guides →